frezik ,

Nuclear is nothing bog standard. If it was, it wouldn't take 10 years. Almost every plant is a boutique job that requires lots of specialists. The Westinghouse AP1000 reactor design was meant to get around this. It didn't.

The experts can stay where they are: maintaining existing nuclear power.

Renewables don't take much skilled labor at all. It's putting solar panels on racks in a field, or hoisting wind blades up a tower (crane operation is a specialty, but not on the level of nuclear engineering).